Site pages
Current course
Participants
General
Topic 1
Topic 2
Topic 3
Topic 4
Topic 5
Topic 6
Topic 7
Topic 8
Topic 9
Topic 10
Topic 11
Topic 12
Topic 13
Topic 14
Topic 15
Topic 16
Topic 17
Land Preparation
Preparation of main field in S.R.I. is the same as in conventional method. However, care should be taken to level the field perfectly with suitable levelers after puddling. Divide the field into small pieces by opening channels for every two meters to avoid inundation.
Fig: Land preparation. |
Last modified: Friday, 13 January 2012, 11:35 AM