Land preparation
-
During April-May, field is ploughed to a depth of 20-25 cm by one or two deep ploughing followed by turning and land is left for some time.
-
Before planting, farmyard manure is incorporated in soil and field is levelled and in sloppy land and flat beds on levelled land.
-
-
Ridges and furrows are made either manually or mechanically.
-
In mechanical method, furrows are made with help of 2-4 row maker-cum-fertilizer drill for applying fertilizers also in one sequence.
-
This is followed by planting of tubers with help of 2-4 row planter-cum-ridger.
-
After application of fertilizers, ridges are also made with tractor drawn ridger and tubers are dibbled 5-7 cm deep on ridges.
-
When bullock drawn implements are used, field is marked with rope or marker and fertilizers and tubers are placed on line and ridges are made.
-
In all methods, utmost care is taken to avoid direct contact of tubers with fertilizer.
|
Last modified: Tuesday, 8 November 2011, 9:23 AM