Experiment No 1 - Earth work calculation for channel making

Practical - 11
Experiment No 1 - Earth work calculation for channel making

Aim:
Computation of volume of earth work in the channels.

Problems:
1. Compute the depth of cut and height of bank at the various sections along the given line from the following data and draw the longitudinal section.


prac11_tbl1


2. Calculate the quantity of earth work for 200 m. length channel in uniform ground with height of banks at the two ends being 1.0 m and 1.6 m. The formation width is 5 m, side slope is 2:1 (H: V). Assume that there is no transverse slope.
Use (i) Mid-sectional area method
(ii) Mean sectional area method.

3. Compute the volume of earth work along the given line from the following data

prac11-tbl2

Assume the following
Formation width = 10 m.
Side slope = 2:1
Use
  • Mid sectional area method
  • Trapezoidal formula method
  • Prismoidal formula method
4. Compute the volume of earth work from the following data

prac11_tbl3

Formation width = 10 m
Side slope
  • Embankment = 2:1
  • Excavation = 1.5:1
Use
  • Mid sectional area method
  • Mean sectional area method