Six Sigma

APPAREL MANUFACTURING – II 3(3+0)

Lesson 44 : Various Quality Systems Prevalent in the World

Six Sigma

Six Sigma follows two project methodologies inspired by Deming's Plan-Do-Check-Act Cycle

hgf

These methodologies, composed of five phases each, bear the acronyms DMAIC and DMADV.

  1. DMAIC is used for projects aimed at improving an existing business process.
  2. DMADV is used for projects aimed at creating new product or process designs.

DMAIC has five phases:

  • Define the problem, the voice of the customer, and the project goals, specifically.
  • Measure key aspects of the current process and collect relevant data.
  • Analyze the data to investigate and verify cause-and-effect relationships. Determine what the relationships are, and attempt to ensure that all factors have been considered. Seek out root cause of the defect under investigation.
  • Improve or optimize the current process based upon data analysis using techniques such as design of experiments, poka yoke or mistake proofing, and standard work to create a new, future state process. Set up pilot runs to establish process capability.
  • Control the future state process to ensure that any deviations from target are corrected before they result in defects. Implement control systems such as statistical process control, production boards , visual workplaces, and continuously monitor the process.

DMADV or DFSS The DMADV project methodology, also known as DFSS ("Design for Six Sigma"), features five phases:

  1. Define design goals that are consistent with customer demands and the enterprise strategy.
  2. Measure and identify CTQs (characteristics that are Critical To Quality), product capabilities, production process capability, and risks.
  3. Analyze to develop and design alternatives, create a high-level design and evaluate design capability to select the best design.
  4. Design details, optimize the design, and plan for design verification. This phase may require simulations.
  5. Verify the design, set up pilot runs, implement the production process and hand it over to the process owner(s).
Index
Previous
Home
Last modified: Thursday, 5 January 2012, 10:33 AM