  • Cauliflower is a shallow rooted crop, so do shallow hoeing to remove weeds and to avoid any injury to the roots.
  • Regular hoeing operations keep crop weed free and provide aeration to the root system.
  • Crust formation in medium heavy and clay soils hinder water and air penetration in root system and should be broken otherwise adversely affect plant growth.
  • Earthing up is important in rainy season as roots get exposed after every shower and should be done 4-5weeks after transplanting.
  • Critical period for crop- weed competition is between 30-50days after transplanting.
  • Use herbicides in initial stages followed by hand weeding in later stages of plant growth along with fertilizer top dressings.
  • Application of Alachlor (Lasso) @2kg a.i. /ha before transplanting is beneficial for controlling annual and broad leaved weeds.
  • Pendimethalin (Stomp) @1.2kg a.i. /ha or Oxyflurofen (Goal) @ 600ml/ha can also be used before transplanting if there is problem of annual weeds only.
IRRIGATION
  • First irrigation should be given immediately after transplanting.
  • Being shallow rooted crop, it requires frequent and light irrigation.
  • Early season crop require irrigation at an interval of 5-7days while mid and late sown crop require irrigation at an interval of 8-12 days.
  • Curd development is the critical stage.
  • Heavy irrigation is avoided at the time of maturity of heads.
  • Optimum moisture level at the time of curd formation is very essential.
BLANCHING
  • An important operation to protect the curds from yellowing due to direct exposure to sun.
  • The curds may also loose some of their flavour because of this exposure.
  • This problem generally occurs in varieties of early and mid maturity group, which have spreading and open plant type.
  • In Snowball group and some of hybrids of early and mid maturity groups, curds remain naturally protected and surrounded by inner whorls of leaves.
  • This may be done by drawing and tying of leaves when curds are fully developed. Sometimes, a leaf of cauliflower is kept over the curd 4-5 days prior to harvesting.
HARVESTING
  • The harvesting of curds is to be done as soon as the curds attain prime maturity and compactness.
  • It is better to harvest little early than late if there is any doubt about the maturity.
  • Delayed harvesting leads to the elongation of flower stalk and loose, over matured curds, deterioration of quality and turns into loose, leafy, ricey and fuzzy. Such curds should be eliminated from the consignment to be sending to the markets as they wilt rapidly and spoil the appearance of the consignment.
  • The curd should be cut-off with stalk along with sufficient number of jacket leaves to protect the curd.
  • Severe trimming of leaves is to be done after unloading or before marketing.
YIELD (q/ha)
  • Early varieties 100-150
  • Mid and late season varieties 150-225.
  • Snowball group may produce up to 500 q/ha.
PRE AND POST HARVEST HANDLING
  • Harvesting should be done preferably in the late evening or early morning so that the product remains turgid and fresh.
  • The freshly harvested plants should be put in the truck or cart in such a way that the bruising of the curd is minimum.
  • These bruised portions of the curd become blackish and unattractive for the fresh market.
STORAGE
  • Most of cauliflower grown in India is harvested and used for fresh consumption.
  • In general, it is not stored in the cold storage because of lack of capital to erect and run the cold storage by farmers.
  • Snowball cauliflower can be stored for 7days at 0oC-1.7oC and RH between 85-95%.
  • Cauliflower with intact leaves and head size 25-30cm diameter are the most suitable for long-term storage.
PACKING AND PACKAGING MATERIAL
  • Generally packaging material is not used for transportation or storage of cauliflower in India.
  • Freshly harvested plants with most of the leaves intact are loaded in cart/truck keeping the curd downward so that they are not exposed to the sun and the leaves protect the curd from bruising and impact damage.
  • This practice is for the market situated nearby.
  • They are sent in gunny bag packings or in crates to distant markets.
  • Cling wraps may be used for packing in which only the curd portion is kept.
VALUE ADDED PRODUCTS
  • In India, cauliflower is mainly dried or processed into mixed vegetable pickles.
  • In the glut season, cauliflower can also be preserved in chemical solution containing 3%salt + 0.3%potassium metabisulphate + 0.8% glacial acetic acid in glass jars for 6-8months for culinary purpose and for pickling.
  • Frozen cauliflower: The curds are washed, cut into pieces, blanched, packed in poly bags of the desired size and then marketed in the lean period.
  • Dehydrated Cauliflower: Cauliflower buttons are separated and cut into small pieces. These pieces are blanched for 4-5 minutes in boiling water, steeped in 0.5% SO2 solution for about an hour, then drained and washed. These are then dried at 60oC for about 10-12 hours. ?The dry matter content is 7 and 8-10% in snowball and tropical cauliflower, respectively.
  • Canning: Canning is also done on limited scale in India. Compact curds are cut into small pieces of suitable size. These are then blanched for 5-6minutes in boiling solution of 0.1%citric acid or titaric acid and subsequently cooled in 2%brine to prevent discolouration. Blanched material is filled in plain cans containing 2%brine, then they are sealed and sterilized. Pink colouration in the canned product is a problem.
SEED PRODUCTION
  • Periods of low temperature (chilling) is not essential, but cool conditions are required for seed production.
  • Seed production of late varieties can only be taken up in hilly regions of the country.
  • Himachal Pradesh has emerged as the major producer of quality cauliflower seed of late varieties.
Methods of Seed Production
  • There are two methods of seed production:
  • In-situ method (Seed-to-Seed method)
  • Replanting method (Head-to-Seed method)
  • For seed production, seed to seed method is recommended, since the head to seed method in India has not been very successful.
  • In seed to seed method, crop is allowed to over winter and produce seed in the original position, where they were first planted in the seedling stage.
Cultural practices/production technology
Time of sowing and transplanting
  • For seed production purpose, the sowing time of cauliflowers should be so adjusted in such a way that the plants put up the maximum leafy growth by the second week of December, when the temperature goes down and the plants become almost dormant.
  • The first week of September is the optimum time of sowing for the seeds in the nursery beds.
  • Transplanting of seedlings should be completed by the end of September.
  • The mean temperature of 6.5-110Cduring February to March is very conducive to curd formation.
  • Early sowing done in June to July, results in curd formation during October to November.
  • The curds, being very susceptible to cold injury, rot during winter and hence fail to flower the following summer.
  • If sown late, the crop starts curd formation late in the spring and consequently flowering is delayed.
Method of seed sowing
  • Method of seed sowing and raising of healthy nursery is same as that of cabbage.
Preparation of land for transplanting
  • The field should be prepared well to fine tilth by one deep ploughing followed by 3 to 4harrowing and plankings/levelings.
Nutrient management
  • The cauliflower seed crop requires heavy manuring as it removes large quantities of major nutrients from the soil.
  • For good seed yield, 20-30tonnes of farmyard manure are applied per hectare.
  • Apply 50 kg/ha nitrogen, 60kg/ha phosphorous and 60kg/ha potassium per hectare before transplanting.
Transplanting
  • Transplant the seedlings when 12 to 15cm long, preferably in the evening time, and irrigate immediately after transplanting..
Spacing
• Row to row : 60-90cm
• Plant to plant : 45-60cm.

Irrigation
  • Irrigate the crop according to the soil type and climatic conditions.
  • A crop after transplanting may need irrigation twice a week and later once in a week.
  • Adequate moisture supplies during flowering and seed formation are necessary to obtain high yields.
Interculture
  • Frequent shallow cultivation should be given to the soil to kill weeds and provide soil mulch.
  • Four to five weeks after transplanting, earthing up of plants is highly desirable.
Early Varieties (Seed Production in Plains):
  • Most of the cultural practices for seed production of early varieties in the plains are same, except for the time of sowing (June to August) as it varies with the varieties and a little closer spacing (60 x 45cm) is adopted and scooping if curds is normally not required.
Isolation distance
  • The seed field must be separated from fields of other varieties, fields of the same variety not confirming to varietal purity requirements of certification, and from all other kinds of cole crops at least 1600 meters for foundation and by 1000 meters for certified seed.
Pollination
  • It is a highly cross-pollinated crop.
  • Honey bees are the usual pollinating agents, though bumble bees and house flies may also be responsible for pollination.
  • It has been found that stigma of Brassica spp. is receptive even 5days before and 4days after anthesis.
  • The period from pollination to fertilization generally takes about 24-48hours, depending on temperature.
  • The ideal temperature has been found to be 12 to180C for seed production in hills.
  • The seeds are globular, smooth and dark brown in colour.
  • The fruit is often called as siliqua and popularly as pod.
Roguing
  • Selection of curds is done when the curds are well developed.
  • Off type plants and those not confirming to varietal characteristics should be removed at this stage.
  • Subsequently roguing for off types, diseased plants and infected with phyllody should be done from time to time.
Harvesting and threshing
  • Harvesting is done when majority of pods turn brown.
  • Overripe pods dehisce, hence harvesting may be done in lots.
  • Generally, the early plants are harvested first when about 60-70per cent of the pods turns brown and rest of the crop changes to yellowish brown.
  • After harvesting, it is piled up for curing.
  • After 4-5days, it is turned upside down and allowed to cure for another 4-5days in the same way.
  • Threshed is done with sticks and sifted with hand sifters.
  • After thorough drying of seed in the sun (up to 7 % moisture content) it is cleaned and stored.
Seed Yield
  • Average seed yield varies from 400-500 kg per hectare
SEED CERTIFICATION STANDARDS

A. Fields Standards

a. General requirements

Isolation distance
  • Seed fields should be isolated from the contaminants as shown in the table given below:

Contaminants

Minimum distance (meter)

Foundation

Certified

Fields of the other varieties

1600

1000

Fields of the same variety not conforming to varietal purity

1600

1000


b. Specific requirements

Factors

Maximum permitted limits (per cent)

Foundation

Certified

Off types

0.10

0.20

Plants affected by seed borne diseases

0.10

0.50


B. Seed Standards

Factors

Standards for each class

Foundation

Certified

Pure Seed (minimum ) %

98

98

Inert matter (maximum ) %

2.0

2.0

Other Crop seeds (maximum) number/kg

5

10

Weed seeds (maximum) number/kg

5

10

Germination (minimum) %

65

65

Moisture (maximum) %

7.0

7.0

For vapour-proof containers (maximum) %

5.0

5.0



Last modified: Thursday, 21 June 2012, 4:44 AM