Checklist for preparing Schedules

TECHNICAL DRAWINGS IN INTERIORS 4(1+3)
Lesson 14:Schedules and Specifications

Checklist for preparing Schedules

General

  • Start numbering door / window symbols in a logical sequence on the floor plans. Eg : from Main entry to back of the building or side to side
  • Title the schedule and use cross reference for use in other sheets
  • Lettering, symbols and line work should be clear and easy to read
  • Use cross reference to explain common symbols or include a key near the schedule also
  • Door dimensions can be placed directly on the floor plan in small residential projects
  • Along with the schedules a presentation board for F F +E may be added
Index
Previous
Home
Last modified: Friday, 21 October 2011, 5:59 AM