Interior Finish Schedule

TECHNICAL DRAWINGS IN INTERIORS 4(1+3)
Lesson 14:Schedules and Specifications

Interior Finish Schedule

An interior finish schedule provides information on the finish materials to be applied to each wall, ceiling, floor surface, and base in a tabular form. Interior finish schedules typically include a tabular form. In a big commercial project, the second part may be added, which is the legend or materials key, if separate finish plans are not provided. Residential finish schedules are briefer than commercial finish schedules since residential finishes are more likely to be common. Commercial projects usually use a much wider range of interior finish materials and need a more complex interior finish schedule. The items in a typical interior finish schedule for a small or residential project include room name, floor material, base material, wall material, ceiling material, ceiling height, and remark (Table - 5). More sub- items can be added to each surface item when different materials are applied to one of the surfaces. For instance, the wall item may include sub- items such as north wall, east wall, south wall, or west wall, when different wall finishes are applied to different walls.

Room name

Floor

Base

Walls

Ceilings

Ceiling height

Remarks

Entrance

Ceramic tile

6” ceramic tile

Paint

Paint



Living room

Marble

6” concrete base

Wall paper

False roofing with Gyp board 7 Al beading


Designs to be selected

Drawing room

Marble

6” concrete base

Wall paper

False roofing with Gyp board 7 Al beading


Designs to be selected

Kitchen

Ceramic tile

6” ceramic tile

Paint

Paint




Table - 5 A typical interior finish schedule for a residential project


The items for a commercial project include mark (room number), room name, floor material, base material, wall material, ceiling material, ceiling height, and remarks. Each surface item lists all the specific finishes that are planned to be applied in the project. Among these materials, the material that will be used in a specific room is checked. (Table - 6).

Mark

Room name

Room finish schedule

Floor

Base

Walls

Ceiling

Ceiling height

Remarks

101

Reception

Carpet

Vinyl

Paint

Paint with frieze work

9 Ft


102

General office area

Tiles

6” concrete base

Paint

paint



103

Supdt office

Tiles

6” concrete base

Paint

Paint



104

M D ‘s room

carpet

Vinyl

Wall paper

False roofing with Gyp board 7 Al beading


Frieze and cornice work as per owners choice


Table - 6. A typical interior finish schedule for a commercial project