An interior finish schedule provides information on the finish materials to be applied to each wall, ceiling, floor surface, and base in a tabular form. Interior finish schedules typically include a tabular form. In a big commercial project, the second part may be added, which is the legend or materials key, if separate finish plans are not provided. Residential finish schedules are briefer than commercial finish schedules since residential finishes are more likely to be common. Commercial projects usually use a much wider range of interior finish materials and need a more complex interior finish schedule. The items in a typical interior finish schedule for a small or residential project include room name, floor material, base material, wall material, ceiling material, ceiling height, and remark (Table - 5). More sub- items can be added to each surface item when different materials are applied to one of the surfaces. For instance, the wall item may include sub- items such as north wall, east wall, south wall, or west wall, when different wall finishes are applied to different walls.
Room name
|
Floor
|
Base
|
Walls
|
Ceilings
|
Ceiling height
|
Remarks
|
Entrance
|
Ceramic tile
|
6” ceramic tile
|
Paint
|
Paint
|
|
|
Living room
|
Marble
|
6” concrete base
|
Wall paper
|
False roofing with Gyp board 7 Al beading
|
|
Designs to be selected
|
Drawing room
|
Marble
|
6” concrete base
|
Wall paper
|
False roofing with Gyp board 7 Al beading
|
|
Designs to be selected
|
Kitchen
|
Ceramic tile
|
6” ceramic tile
|
Paint
|
Paint
|
|
|
Table - 5 A typical interior finish schedule for a residential project
The items for a commercial project include mark (room number), room name, floor material, base material, wall material, ceiling material, ceiling height, and remarks. Each surface item lists all the specific finishes that are planned to be applied in the project. Among these materials, the material that will be used in a specific room is checked. (Table - 6).
Mark
|
Room name
|
Room finish schedule
|
Floor
|
Base
|
Walls
|
Ceiling
|
Ceiling height
|
Remarks
|
101
|
Reception
|
Carpet
|
Vinyl
|
Paint
|
Paint with frieze work
|
9 Ft
|
|
102
|
General office area
|
Tiles
|
6” concrete base
|
Paint
|
paint
|
|
|
103
|
Supdt office
|
Tiles
|
6” concrete base
|
Paint
|
Paint
|
|
|
104
|
M D ‘s room
|
carpet
|
Vinyl
|
Wall paper
|
False roofing with Gyp board 7 Al beading
|
|
Frieze and cornice work as per owners choice
|
Table - 6. A typical interior finish schedule for a commercial project
|