Site pages
Current course
Participants
General
Topic 1
Topic 2
Topic 3
Topic 4
Topic 5
Topic 6
Topic 7
Topic 8
Topic 9
Topic 10
Topic 11
Topic 12
Topic 13
Topic 14
Topic 15
Topic 16
Topic 17
Topic 18
Topic 19
Topic 20
Topic 21
Topic 22
Topic 23
Topic 24
Topic 25
Topic 26
Topic 27
Topic 28
Topic 29
Topic 30
Topic 31
Topic 32
Ranging of survey line
Unit 1- Surveying
Ranging, types of ranging
Ranging of survey line:
While measuring the length of a ‘Survey line’ or ‘Chain line’, the chain or tape must be stretched straight along the line joining its two terminal stations. If the length of the survey line is less than the length of the chain, there will be no difficulty in doing so. However, if the length of survey line exceeds the length of the chain, some intermediate points will have to be established in line with the two terminal points before chaining is started. The process of fixing or establishing such intermediate points is known as Ranging.Last modified: Thursday, 21 April 2011, 10:20 AM