When to open the silo?
-
Within a period of two to three weeks the forages will be converted into silage. Depending upon the type of the crop used for ensiling, addition of additives, packing and sealing of the silo pits and the atmospheric condition, the duration of silage getting ready may vary.
-
However a maximum of 6 - 8 weeks is enough for the anaerobic fermentation of the forage crops to get itself converted into a good silage material.
-
The silage may be taken out of the silo from the top in case of tower and trench silos and from the front side in case of a bunker silo. After opening it becomes necessary to feed a pit completely.
-
A two to four inch layer of silage must be removed daily. In case the silage is not used for livestock feed immediately after its preparation, the accumulation of by-products of bacterial metabolism will tend to preserve the forage material as silage for an indefinite period unless air is permitted to enter.
|
Last modified: Monday, 1 August 2011, 6:32 AM