3.2.5.2.Precautions to be taken during heat processing
- Check and recalibrate the instrument attached to the retort.
- Jumble stack the cans so that steam easily circulate around the cans.
- Slowly and steadily bring up the retort to processing temperature/pressure.
- Prevent leakage of steam through the gasket of door.
- Vent the retort completely. There should not be any air inside the retort
- Maintain the temperature and pressure uniformly without fluctuations throughout the heat process.
- At the end of process, let out the steam steadily and not suddenly till all the steam escapes and pressure drops to “O”.
- Immediately cool the cans in good quality running water.